Intex JR. TWIN ROLL´N GO AIRBED KIT User Manual

Browse online or download User Manual for Sports and recreation Intex JR. TWIN ROLL´N GO AIRBED KIT. Intex JR. TWIN ROLL´N GO AIRBED KIT User Manual [de] [en] [pl] [cs]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 2
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
69PO
(69PO) 3 IN 1 VALVE ENGLISH 4.875” X 7.25” 10/21/2013
SAVE THESE INSTRUCTIONS
Page 1
69PO
SAVE THESE INSTRUCTIONS
Page 2
(69PO) 3 IN 1 VALVE ENGLISH 4.875” X 7.25” 10/21/2013
069-*PO-R0-1410
Quick-inflation cap
Quick-exhaust cap
Optional inflation cap
Quick-inflation cap O-ring
Quick-exhaust cap O-ring
Rubber diaphragm
3 IN 1 VALVE INSTRUCTION
TO INFLATE
WITH QUICK-INFLATION VALVE
1. Ensure the quick-exhaust and
the optional inflation caps are
securely tightened.
2. Turn the quick-inflation cap
fully counterclockwise.
See Fig 1-a.
3. Pull the quick-inflation cap to
open. See Fig 1-b.
4. Insert the inflation opening of
an air pump directly into the
quick-inflation valve. See Fig 2.
5. Inflate the product to
approximately 80% of desired
firmness.
CAUTION: To prevent
bursting, do not over inflate
or use high pressure air
compressor.
6. Align the two " " on the cap
with the arrows on both side of
the quick-exhaust cap tabs and
push in firmly. See Fig 3-a.
7. Turn the quick-inflation cap
fully clockwise to close.
See Fig 3-b.
a
b
Fig 1
Fig 2
a
b
Fig 3
Fig 4
Fig 6
Fig 5
Fig 7
TO INFLATE
WITH OPTIONAL INFLATION
VALVE
8. Ensure the quick-exhaust and
the quick-inflation caps are
securely tightened.
9. Pull the optional inflation cap
tab to open. See Fig 4.
10. Insert the nozzle of an air pump
into the inflation valve.
See Fig 5.
11. Inflate the product to
approximately 80% of desired
firmness.
CAUTION: To prevent
bursting, do not over inflate
or use high pressure air
compressor.
12. Close the optional inflation cap
securely after inflation. See
Fig 6.
TO ADJUST
13. If the product is too firm, open
the quick-inflation cap, repeat
steps #2 and #3.
14. Gently press one of the 3
protruding tabs on the
quick-inflation valve to release a
small amount of air.
CAUTION: Do not bend or
fold down the black rubber
diaphragm. See Fig 7.
15. When the desired firmness is
achieved, replace the
quick-inflation cap back. See
Fig 3.
Page view 0
1 2

Summary of Contents

Page 1 - SAVE THESE INSTRUCTIONS

69PO(69PO) 3 IN 1 VALVE ENGLISH 4.875” X 7.25” 10/21/2013SAVE THESE INSTRUCTIONSPage 169POSAVE THESE INSTRUCTIONSPage 2(69PO) 3 IN 1 VALVE ENGLI

Page 2

69PO 69PO69PO(69PO) 3 IN 1 VALVE ENGLISH 4.875” X 7.25” 10/21/2013SAVE THESE INSTRUCTIONSPage 3©2013 Intex Marketing Ltd. - Intex Development Co.

Comments to this Manuals

No comments